Main Street Bridge Maintenance

January 2014 - Spring 2015
 

  • Please click here* to read the news release from the Florida Department of Transportation.
  • FDOT permanently closing Main Street Bridge access to Hendricks Avenue. To read the news release please go to: *
 
Scheduled Closures

Saturday, November 15, 2014 - Friday, November 21, 2014

Per the Florida Department of Transportation: 
"Complete bridge closure from Friday at 9 p.m. to Sunday at 6 a.m. Traffic is detoured to Acosta Bridge.
 
Daytime lane closures from 9 a.m. to 4 p.m. from Bay Street to the south end of the bridge for replacement of the west sidewalk.
 
The west sidewalk is closed at Riverplace Boulevard to the south end of the bridge.  Pedestrians should cross Main Street to use the entrance at Museum Circle. The sidewalk is closed at the Main Street on-ramp so pedestrians should use Laura Street to Bay Street to Newnan Street then back to Main Street. The east sidewalk will be closed from Friday at 9 p.m. to Saturday at 6 a.m. and again from Saturday 6 p.m. to Sunday 6 a.m. pedestrians should follow detours during that time.
 
Daytime southbound on-ramp closures from Independent Drive from 9 a.m. to 4 p.m. for west sidewalk replacement. Detour is Independent Drive to Ocean Street, Bay Street and back to Main Street." 
 


**Schedule subject to change

Keep checking this web page for updates or changes to the schedule.
 

*Reading the PDF document(s) on this page requires the Adobe Acrobat Reader available free from Adobe.
 

Find it by...
Offices:
Service:

Accessibility | Site Policies | Site Map | Site Index | Employee Search | Help

Need Assistance? Call (904) 630-CITY

Dial 911 in the event of an emergency or (904) 630-0500 for a non-emergency.

v2.001