Main Street Bridge Maintenance

January 2014 - Spring 2015
 

  • Please click here* to read the news release from the Florida Department of Transportation.
  • FDOT permanently closing Main Street Bridge access to Hendricks Avenue. To read the news release please go to: *
 
Scheduled Closures

Saturday, September 13, 2014 - Friday, September 19, 2014

"Daytime northbound closure from 9 a.m. to 4 p.m. Monday through Friday south of Riverplace Boulevard through the north end of the bridge for replacement of the east sidewalk and concrete work. 
 
Daytime northbound off ramp closure from 9 a.m. to 4 p.m. Monday through Friday for replacement of the east sidewalk. The detour is Bay and Newnan streets.
 
Daytime northbound on ramp closure from 9 a.m. to 4 p.m. Monday through Friday at the on ramp from Riverplace Boulevard for replacement of the east sidewalk.  The detour is Riverplace Boulevard, Museum Circle, Mary Street and on ramp to Acosta Bridge.   
 
The northbound sidewalk is closed at Riverplace Boulevard; however the west side remains open.  The detour is Riverplace Boulevard below Main Street and entrance off of Museum Circle. 
 
Complete bridge closure from 5 a.m. to 8 p.m. Saturday for bridge repairs.  The detour is Acosta Bridge." -information provided by the Florida Department of Transportation


**Schedule subject to change

Keep checking this web page for updates or changes to the schedule.
 

*Reading the PDF document(s) on this page requires the Adobe Acrobat Reader available free from Adobe.
 
Find it by...
Offices:
Service:

Accessibility | Site Policies | Site Map | Site Index | Employee Search | Help

Need Assistance? Call (904) 630-CITY

Dial 911 in the event of an emergency or (904) 630-0500 for a non-emergency.

v2.001